快猫免费破解版apk

400-1611-663 24-hour service phone: 400-1611-663
/ TODAY'S SPECIALS 更多>> Product Center / TODAY'S SPECIALSMore >>
  • 济柴900KW柴油发电机组参数
    Marathon Electromechanical Jichai Unit Model Diesel Engine Model Generator Model GF-900Z12V190BLLSM-900GF-900KW Unit Parameters Common Power: 900KW Rated Current: 1620A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H Unit weight: 10500kg Noise (LP7M): 100db (A) Dimensions: 5800 * 1650 * 2720 (L * W * H) mmZ12V190B Diesel engine parameters Brand: Jichai Diesel Co., Ltd. Number of cylinders / block structure: 12 / L Displacement: 71.15L Bore stroke: 190 * 210 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF -900 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic voltage adjustment ) Power factor: cosΦ = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Is the air filter indicating normal?

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run at idle for a long time, and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that meets national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large-scale electrical equipment by reducing pressure and frequency, etc. Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended that the units be operated at least once a month to the operating temperature, and that the units be operated at full load for about 4 hours at least once a year, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important to perform regular maintenance on the unit. If the relevant regulations for unit maintenance can be strictly observed, the performance of the unit and environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. The negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please strictly follow the above maintenance time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 济柴1000KW柴油发电机组参数
    Marathon Mechanical and Electrical Jichai Unit Model Diesel Engine Model Generator Model GF-1000Z12V190BD7LLSM-1000GF-1000KW Unit Parameters Common Power: 1000KW Rated Current: 1800A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H Unit weight: 11000kg Noise (LP7M): 100db (A) Dimensions: 5800 * 1650 * 2720 (L * W * H) mmZ12V190BD7 Diesel engine parameters Brand: Jichai Diesel Co., Ltd. Number of cylinders / block structure 12 / L Displacement: 71.15L Bore stroke: 190 * 210 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF -1000 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment ) Power factor: cosΦ = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Is the air filter indicating normal?

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run at idle for a long time, and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that meets national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large-scale electrical equipment by reducing pressure and frequency, etc. Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended that the units be operated at least once a month to the operating temperature, and that the units be operated at full load for about 4 hours at least once a year, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important to perform regular maintenance on the unit. If the relevant regulations for unit maintenance can be strictly observed, the performance of the unit and environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. The negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please strictly follow the above maintenance time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 济柴1100KW柴油发电机组参数
    Marathon Electromechanical Jichai Unit Model Diesel Engine Model Generator Model GF-1100G12V190ZL1LLSM-1100GF-1100KW Unit Parameter Common Power: 1100KW rated current: 1980A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 203g / KW * H Unit weight: 11000kg Noise (LP7M): 100db (A) Overall dimensions: 5800 * 1650 * 2720 (L * W * H) mmG12V190ZL1 12 / L Displacement: 73.15L Bore stroke: 190 * 210 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF -1100 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR ) Power factor: cosΦ = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Is the air filter indicating normal?

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run at idle for a long time, and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that meets national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large-scale electrical equipment by reducing pressure and frequency, etc. Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended that the units be operated at least once a month to the operating temperature, and that the units be operated at full load for about 4 hours at least once a year, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important to perform regular maintenance on the unit. If the relevant regulations for unit maintenance can be strictly observed, the performance of the unit and environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. The negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please strictly follow the above maintenance time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 济柴1400KW柴油发电机组参数
    Marathon Electromechanical Jichai Unit Model Diesel Engine Model Generator Model GF-1400G12V190ZLDLLSM-1400GF-1400KW Unit Parameter Common Power: 1400KW Rated Current: 2520A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H Unit weight: 11000kg Noise (LP7M): 100db (A) Dimensions: 5580 * 1910 * 2400 (L * W * H) mmG12V190ZLD Diesel engine parameters Brand: Jichai Diesel Co., Ltd. Number of cylinders / block structure: 12 / L Displacement: 73.15L Bore stroke: 190 * 215 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF -1400 Generator parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation level: H-class Protection level: IP22 Wiring mode: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR ) Power factor: cosΦ = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Is the air filter indicating normal?

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run at idle for a long time, and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that meets national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large-scale electrical equipment by reducing pressure and frequency, etc. Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended that the units be operated at least once a month to the operating temperature, and that the units be operated at full load for about 4 hours at least once a year, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important to perform regular maintenance on the unit. If the relevant regulations for unit maintenance can be strictly observed, the performance of the unit and environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. The negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please strictly follow the above maintenance time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 济柴1800KW柴油发电机组参数
    Marathon Electromechanical Jichai Unit Model Diesel Engine Model Generator Model GF-1800H12V190ZLLSM-1800GF-1800KW Unit parameters Common power: 1800KW Rated current: 3240A Rated voltage: 400V / 230V Rated frequency: 50HZ Rated speed: 1500r / min Fuel consumption: 203g / KW * H Unit weight: 17400kg Noise (LP7M): 100db (A) Dimensions: 7200 * 2850 * 3900 (L * W * H) mmH12V190Z Diesel engine parameter brand: Jichai Diesel Co., Ltd. Number of cylinders / block structure: 12 / L Displacement: 73.15L Bore stroke: 190 * 215 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF -1800 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic voltage adjustment ) Power factor: cosΦ = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Is the air filter indicating normal?

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run at idle for a long time, and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that meets national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large-scale electrical equipment by reducing pressure and frequency, etc. Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended that the units be operated at least once a month to the operating temperature, and that the units be operated at full load for about 4 hours at least once a year, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important to perform regular maintenance on the unit. If the relevant regulations for unit maintenance can be strictly observed, the performance of the unit and environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. The negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please strictly follow the above maintenance time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 济柴2500KW柴油发电机组参数
    Marathon Electromechanical Jichai Unit Model Diesel Engine Model Generator Model GF-2500H16V190ZLLLSM-2500GF-2500KW Unit parameters Common power: 2500KW Rated current: 4500A Rated voltage: 400V / 230V Rated frequency: 50HZ Rated speed: 1500r / min Fuel consumption: 203g / KW * H Unit weight: 17400kg Noise (LP7M): 100db (A) Dimensions: 7200 * 2850 * 3900 (L * W * H) mmH16V190ZL Diesel engine parameters Brand: Jichai Diesel Co., Ltd. Number of cylinders / block structure: 16 / L Displacement: 97.53L Bore stroke: 190 * 215 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF -2500 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR ) Power factor: cosΦ = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Is the air filter indicating normal?

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run at idle for a long time, and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that meets national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large-scale electrical equipment by reducing pressure and frequency, etc. Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended that the units be operated at least once a month to the operating temperature, and that the units be operated at full load for about 4 hours at least once a year, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important to perform regular maintenance on the unit. If the relevant regulations for unit maintenance can be strictly observed, the performance of the unit and environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. The negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please strictly follow the above maintenance time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
6 页次1/1 首页 上一页 1 下一页 尾页 Total 6 items Page 1 / 1FirstPrev1NextLast
contact us
Contact
  • Scan and follow us for more surprises
Copyright © 2005-2013 Yunnan Marathon Mechanical and Electrical Equipment Co., Ltd.
Rhino Cloud provides cloud computing services
Address: No. 75 Dashiba Village, Ala Street, Economic Development Zone, Kunming, Yunnan
Phone: 18187015515
Fax: 0871-67163337
Postcode: 650000