    Visible copper wire core. Pure copper quality, authentic guarantee. Low oil pressure, over current, high oil temperature, over load. Why use a copper rotor instead of an aluminum rotor? Die-casting technology: brushed, brushless generator and brushed motors: Principle: Carbon brush and copper ring friction generate current. Advantages: affordable price, simple and clear design, simple maintenance, low repair cost, excellent low-speed torque performance, large torque, strong instantaneous load capacity, especially easy to start large motors. Mainly suitable for outdoor power: construction sites, factories, mixing stations, mining areas, aquaculture, etc. Mainly because brushed generators are easy to start for large electrical equipment, have strong power, and are fast and easy to repair when they fail. Brushless motor; Principle: Magnetic field generates current, advantages: Eliminates the maintenance-free failure rate of conductive carbon brushes in brushed generators, and the operation and voltage are very stable. Long life, low interference to radio equipment, low noise, especially suitable for high-precision equipment and indoor electrical equipment. Mainly suitable for hospitals, hotels, Internet cafes, KTV, hotel villas, companies and other places. Intelligent automatic control screen, safer high water temperature protection: When the temperature of the water tank of the unit reaches above 98 degrees, the control module will issue a high water temperature warning to stop the protection and overcurrent protection: When the user's load exceeds the power of the generator set, an alarm shutdown will occur . Overload protection: When the user uses a load that exceeds the rated current of the generator set, the generator set will stop and alarm. Low oil pressure protection: When the oil in the generator set is insufficient or reaches the alarm or warning level, the generator set will issue a low oil pressure alarm. Skyworth high-quality radiators have high heat transfer coefficients and good thermal performance. Can increase the heat dissipation area of the outer wall (with winged fins) to increase the flow speed of the air around the radiator (such as a steel string radiator and a cover) to enhance the radiation intensity of the external surface of the radiator (such as a coating with a high radiation coefficient on the external surface) Measures to reduce the thermal resistance between the parts of the radiator (such as the steel string and string of steel string radiators) and other measures to improve the thermal performance of the radiator. Standard configuration: original factory water-cooled diesel engine pure copper generator self-starting controller (standard above 250KW, optional below 250KW) optional radiator configuration: base tank ATS dual power automatic switch control cabinet ATS dual power automatic switch control It should be composed of an intelligent controller and a high-performance dual-power automatic transfer switch, which is suitable for direct automatic switching of main power, main power and emergency power. It forms an automatic induction power supply system with a self-starting diesel generator set, which can power off when the main power After that, the loads such as emergency power supply lighting, security power supply, and fire protection equipment are automatically switched to the generator set. It is an indispensable electrical equipment such as emergency power supply and fire protection power supply for hospitals, banks, airports, radio stations, hotels, intelligent buildings and factory enterprises. The switching operation can be set to automatic mode and manual mode, or it can be switched by manually operating the switch. The panel displays the voltage, current, frequency, power, etc. of the two power sources, and displays the power supply status of the two power sources at the same time. The control module can be set to set one power priority, two power priority or no priority (that is, standby for each other) at the scene. the way. If a control module with a communication interface is selected, the "three remote" functions of remote control, telemetry, and remote signaling of the dual power switch can be realized through the control screen. The control cabinet adopts cold-rolled steel plate material, the surface is electrostatic sprayed, and the components and components are imported or domestic well-known brand products with compact structure. Mobile trailer: The unit has unique innovation, high mobility, low center of gravity, short braking distance, excellent manufacturing, and beautiful appearance. The structural node of the steel plate impeachment suspension is reasonable, the strength is high, and the rigidity is good. The power station is easy to move, flexible to operate, and has good sealing. And equipped with hand brake, air brake, rear tail lights and other systems, in line with highway driving requirements. It is widely used in construction sites, highways, railway construction, and temporary sites. Rain cover: beautiful appearance, reasonable structure; good sealing: rain, snow, dust, and can work in harsh environments; fully enclosed box, made of 2MM steel plate; smooth ventilation inside the box, the temperature is not easy to be too high To ensure the unit's operating power. High-frequency, intermediate-frequency and low-frequency PUR flame-retardant sound-absorbing cotton is used in the cabinet to effectively reduce the different noises emitted by the unit. The door seam is sealed with EPDM type keel seal. The muffler adopts high-resistance muffler, which can effectively reduce the noise of the unit's smoke exhaust port. The operability is good. The designer takes the human-oriented guiding ideology into consideration and fully considers the convenience of the operator in operating the generator set. Parallel cabinet: The parallel control screen can control two or more diesel generators to run in parallel. This system has the following significant advantages: 1. Low purchase cost: Compared with the purchase of a single large-scale unit, the purchase price of several small-scale units is only 50-70% 2. Low use cost: Automatically put in the appropriate number according to the size of the load. Avoid high-power units running at low load. 3. Low maintenance cost: the parts of high-power units are easy to damage and overhaul costs are expensive and it is not easy to organize small-scale units with sufficient parts and low maintenance costs. 4. Long service life: Adopt the rotation rest system to reduce each unit within the same power generation time. Unit usage frequency 5. More reliable: In a grid-connected system, even if one unit fails, other units continue to use, avoiding the situation of single unit failure and all downtime, which is convenient for transportation, lifting and installation . Fuel Tank Battery Floater Battery Charger Mobile Trailer Chassis Product Parameters Speed 1500r / min Fuel consumption 195g / KW * H Dimensions 1650 * 750 * 1450mm Unit weight 650kg Noise (LP7M) 102db (A) Diesel engine parameters 11: 1 cylinder total displacement 11L starting method 24V DC starting cooling method closed cycle water cooling oil supply method direct injection speed regulation method electronic speed regulation intake method turbo generator parameter brand Hong Kong Lilaisenma insulation level H protection Grade IP22 wiring mode Three-phase four-wire / Y-type winding voltage adjustment mode AVR (automatic voltage adjustment) power factor cos = 0.8 (lag)

    康明斯200KW柴油发电机组

    康明斯200KW柴油发电机组

    康明斯200KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2019 - 10 - 24 Release time: 2019-10-24
  • 康明斯200KW柴油发电机组
    Visible copper wire core. Pure copper quality, authentic guarantee. Low oil pressure, over current, high oil temperature, over load. Why use a copper rotor instead of an aluminum rotor? Die-casting technology: brushed, brushless generator and brushed motors: Principle: Carbon brush and copper ring friction generate current. Advantages: affordable price, simple and clear design, simple maintenance, low repair cost, excellent low-speed torque performance, large torque, strong instantaneous load capacity, especially easy to start large motors. Mainly suitable for outdoor power: construction sites, factories, mixing stations, mining areas, aquaculture, etc. Mainly because brushed generators are easy to start for large electrical equipment, have strong power, and are fast and easy to repair when they fail. Brushless motor; Principle: Magnetic field generates current, advantages: Eliminates the maintenance-free failure rate of conductive carbon brushes in brushed generators, and the operation and voltage are very stable. Long life, low interference to radio equipment, low noise, especially suitable for high-precision equipment and indoor electrical equipment. Mainly suitable for hospitals, hotels, Internet cafes, KTV, hotel villas, companies and other places. Intelligent automatic control screen, safer high water temperature protection: When the temperature of the water tank of the unit reaches above 98 degrees, the control module will issue a high water temperature warning to stop the protection and overcurrent protection: When the user's load exceeds the power of the generator set, an alarm shutdown will occur . Overload protection: When the user uses a load that exceeds the rated current of the generator set, the generator set will stop and alarm. Low oil pressure protection: When the oil in the generator set is insufficient or reaches the alarm or warning level, the generator set will issue a low oil pressure alarm. Skyworth high-quality radiators have high heat transfer coefficients and good thermal performance. Can increase the heat dissipation area of the outer wall (with winged fins) to increase the flow speed of the air around the radiator (such as a steel string radiator and a cover) to enhance the radiation intensity of the external surface of the radiator (such as a coating with a high radiation coefficient on the external surface) Measures to reduce the thermal resistance between the parts of the radiator (such as the steel string and string of steel string radiators) and other measures to improve the thermal performance of the radiator. Standard configuration: original factory water-cooled diesel engine pure copper generator self-starting controller (standard above 250KW, optional below 250KW) optional radiator configuration: base tank ATS dual power automatic switch control cabinet ATS dual power automatic switch control It should be composed of an intelligent controller and a high-performance dual-power automatic transfer switch, which is suitable for direct automatic switching of main power, main power and emergency power. It forms an automatic induction power supply system with a self-starting diesel generator set, which can power off when the main power After that, the loads such as emergency power supply lighting, security power supply, and fire protection equipment are automatically switched to the generator set. It is an indispensable electrical equipment such as emergency power supply and fire protection power supply for hospitals, banks, airports, radio stations, hotels, intelligent buildings and factory enterprises. The switching operation can be set to automatic mode and manual mode, or it can be switched by manually operating the switch. The panel displays the voltage, current, frequency, power, etc. of the two power sources, and displays the power supply status of the two power sources at the same time. The control module can be set to set one power priority, two power priority or no priority (that is, standby for each other) at the scene. the way. If a control module with a communication interface is selected, the "three remote" functions of remote control, telemetry, and remote signaling of the dual power switch can be realized through the control screen. The control cabinet adopts cold-rolled steel plate material, the surface is electrostatic sprayed, and the components and components are imported or domestic well-known brand products with compact structure. Mobile trailer: The unit has unique innovation, high mobility, low center of gravity, short braking distance, excellent manufacturing, and beautiful appearance. The structural node of the steel plate impeachment suspension is reasonable, the strength is high, and the rigidity is good. The power station is easy to move, flexible to operate, and has good sealing. And equipped with hand brake, air brake, rear tail lights and other systems, in line with highway driving requirements. It is widely used in construction sites, highways, railway construction, and temporary sites. Rain cover: beautiful appearance, reasonable structure; good sealing: rain, snow, dust, and can work in harsh environments; fully enclosed box, made of 2MM steel plate; smooth ventilation inside the box, the temperature is not easy to be too high To ensure the unit's operating power. High-frequency, intermediate-frequency and low-frequency PUR flame-retardant sound-absorbing cotton is used in the cabinet to effectively reduce the different noises emitted by the unit. The door seam is sealed with EPDM type keel seal. The muffler adopts high-resistance muffler, which can effectively reduce the noise of the unit's smoke exhaust port. The operability is good. The designer takes the human-oriented guiding ideology into consideration and fully considers the convenience of the operator in operating the generator set. Parallel cabinet: The parallel control screen can control two or more diesel generators to run in parallel. This system has the following significant advantages: 1. Low purchase cost: Compared with the purchase of a single large-scale unit, the purchase price of several small-scale units is only 50-70% 2. Low use cost: Automatically put in the appropriate number according to the size of the load. Avoid high-power units running at low load. 3. Low maintenance cost: the parts of high-power units are easy to damage and overhaul costs are expensive and it is not easy to organize small-scale units with sufficient parts and low maintenance costs. 4. Long service life: Adopt the rotation rest system to reduce each unit within the same power generation time. Unit usage frequency 5. More reliable: In a grid-connected system, even if one unit fails, other units continue to use, avoiding the situation of single unit failure and all downtime, which is convenient for transportation, lifting and installation . Fuel tank battery float charger battery charger mobile trailer chassis product parameters marathon mechanical and electrical unit model diesel engine model generator model GF-200MTA11-G2YF-200 unit parameters common power 200KW rated current 360A rated voltage 400V / 230V rated frequency 50HZ rated speed 1500r / Min Fuel Consumption 207g / KW * H Dimension 2400 * 970 * 1500mm Unit Weight 28460kg Noise (LP7M) 102db (A) Diesel Engine Parameter Brand / Place of Origin Cummins / Chongqing Number of Cylinders / Block Structure 6 / L-type Compression Ratio 11: 1 Cylinder Total Displacement 11L Startup Mode 24V DC Startup Cooling Mode Closed Circulation Water Cooled Oil Supply Mode Direct Injection Speed Regulation Mode Electronic Speed Regulation Intake Mode Turbocharger Generator Parameter Brand Hong Kong Lilaisenma Insulation Level H Protection Level IP22 Wiring Mode Three-phase four-wire / Y-type winding voltage regulation mode AVR (automatic voltage regulation) power factor cos = 0.8 (lag)

    康明斯200KW柴油发电机组

    康明斯200KW柴油发电机组

    康明斯200KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 东风康明斯40KW柴油发电机组
    Marathon mechanical and electrical unit model Diesel engine model Generator model GF-1606CTA8.3-G2YF-160 Unit parameters Common power 160KW rated current 270A rated voltage 400V / 230V rated frequency 50HZ rated speed 1500r / min fuel consumption 207g / KW * H outline size 2400 * 970 * 1500mm unit weight 1500kg noise (LP7M) 102db (A) diesel engine parameter brand / origin Cummins / Chongqing cylinder number / cylinder block structure 6 / L compression ratio 8.3: 1 cylinder total displacement 8.3L starting method 24V DC starting cooling Closed-cycle water-cooled oil supply method Direct injection speed regulation Electronic speed regulation Air-intake method Turbo-generator parameter brand / origin jade generator / Shanghai insulation class H protection class IP22 Wiring method Three-phase four-wire / Y-type winding Connected to voltage regulation mode AVR (automatic voltage regulation) power factor cos = 0.8 (lag)

    康明斯160KW柴油发电机组

    康明斯160KW柴油发电机组

    康明斯160KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.



    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 重庆康明斯1400KW柴油发电机组参数
    Marathon Electromechanical Chongqing Cummins Unit Model Unit Diesel Model Generator Model GF-1400KTA50-GS8LLSM-1400GF-1400KW Unit Parameter Common Power: 1400KW rated current 2520A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 248g / KW * H Unit weight: 9570kg Noise (LP7M): 100db (A) Dimensions: 5120 * 2040 * 2700 (L * W * H) mmKTA50-GS8 Diesel engine parameter brand: Chongqing Cummins Number of cylinders / block structure: 16 / L type Displacement: 50L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF-1400 Generator parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic Voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 东风康明斯50KW柴油发电机组
    Marathon mechanical and electrical unit model Diesel engine model Generator model GF-504BT3.9-G2LLSM-50 Unit parameters Common power 50KW rated current 90A rated voltage 400V / 230V rated frequency 50HZ rated speed 1500r / min fuel consumption 195g / KW * H outline size 1650 * 750 * 1450mm unit weight 650kg noise (LP7M) 102db (A) diesel engine parameter brand / origin Cummins / Chongqing cylinder number / cylinder block structure 4 / L type compression ratio 37.8: 1 cylinder total displacement 37.8L starting method 24V DC starting cooling Closed-cycle water-cooled oil supply method Direct injection speed control method Electronic speed control Air inlet method Turbo generator Parameter Brand / origin Hong Kong Lilaisenma Insulation class H class Protection class IP22 Wiring method Three-phase four-wire / Y-type winding Connected to voltage regulation mode AVR (automatic voltage regulation) power factor cos = 0.8 (lag)

    康明斯800KW柴油发电机组

    康明斯800KW柴油发电机组

    康明斯800KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 东风康明斯75KW柴油发电机组
    Marathon Electromechanical Unit Model Diesel Engine Model Generator Model GF-710KTA38-G2BYF-710 Unit Parameters Common Power 710KW Rated Current 1152A Rated Voltage 400V / 230V Rated Frequency 50HZ Rated Speed 1500r / min Fuel Consumption 207g / KW * H Dimension 4387 * 1808 * 2384mm unit weight 7794kg noise (LP7M) 102db (A) diesel engine parameter brand / origin Cummins / Chongqing cylinder number / cylinder block structure 12 / L type compression ratio 37.8: 1 cylinder total displacement 37.8L starting mode 24V DC starting cooling mode closed Type circulating water-cooled oil supply method direct injection speed regulation method electronic speed regulation intake method turbocharger generator parameter brand / origin jade generator / Shanghai insulation class H-class protection IP22 wiring method three-phase four-wire / Y-type winding voltage Adjustment mode AVR (Automatic Voltage Regulation) power factor cos = 0.8 (lag)

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    康明斯710KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
  • 重庆康明斯350KW柴油发电机组参数
    Marathon Mechanical and Electrical Chongqing Cummins unit model diesel engine model generator model GF-350NTA855-G7LLSM-350GF-350KW unit parameters common power: 350KW rated current: 630A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption : 70.9g / KW * H Unit weight: 2900kg Noise (LP7M): 100db (A) Dimensions: 3400 * 1050 * 2050 (L * W * H) mm NTA855-G7 Diesel engine parameter brand: Chongqing Cummins cylinder number / cylinder block structure : 6 / L type Displacement: 14L Bore stroke: 140 * 152mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF -350 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic voltage regulation) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯1100KW柴油发电机组参数
    Chongqing Cummins 1100KW Diesel Generator Set Parameters Marathon Mechanical and Electrical Chongqing Cummins Unit Model Diesel Model Generator Model GF-1100KTA50-G3LLSM-1100GF-1100KW Unit Parameters Common Power: 1100KW rated current 1980A rated voltage: 400V / 230V rated frequency: 50HZ rated speed : 1500r / min Fuel consumption: 202g / KW * H Unit weight: 9210kg Noise (LP7M): 100db (A) Overall dimensions: 5120 * 2040 * 2640 (L * W * H) mmKTA50-G3 Diesel engine parameter brand: Chongqing Cummins cylinder Number / cylinder structure: 16 / L type Displacement: 50L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation intake method : Turbocharged GF-1100 generator parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation grade: H-grade Protection grade: IP22 Wiring mode: Three-phase four-wire / Y-type winding Voltage regulation mode: AVR (Automatic Voltage Regulation) power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 东风康明斯120KW柴油发电机组
    Marathon mechanical and electrical unit model Diesel engine model Generator model GF-500KTAA19-G5YF-500 Unit parameters Common power 500KW rated current 828A rated voltage 400V / 230V rated frequency 50HZ rated speed 1500r / min fuel consumption 207g / KW * H outline size 3680 * 1525 * 2059mm unit weight 4300kg noise (LP7M) 102db (A) diesel engine parameter brand / origin Cummins / Chongqing cylinder number / cylinder block structure 6 / L compression ratio 18.9: 1 cylinder total displacement 18.9L starting mode 24V DC starting cooling mode closed Type circulating water-cooled oil supply method direct injection speed regulation method electronic speed regulation intake method turbocharger generator parameter brand / origin jade generator / Shanghai insulation class H-class protection IP22 wiring method three-phase four-wire / Y-type winding voltage Adjustment mode AVR (Automatic Voltage Regulation) power factor cos = 0.8 (lag)

    康明斯500KW柴油发电机组

    康明斯500KW柴油发电机组

    康明斯500KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2018 - 10 - 16 Release time: 2018-10-16
108 页次1/12 首页 上一页 1 2 3 4 5 6 7 8 9 10 ... 下一页 尾页 Total 108 items Page 1/12 First Previous 1 2 3 4 5 6 7 8 9 10 ... Next Last
contact us
Contact
  • Scan and follow us for more surprises
Copyright © 2005-2013 Yunnan Marathon Mechanical and Electrical Equipment Co., Ltd.
Rhino Cloud provides cloud computing services
Address: No. 75 Dashiba Village, Ala Street, Economic Development Zone, Kunming City, Yunnan Province
Phone: 18187015515
Fax: 0871-67163337
Postcode: 650000