  • 云内柴油发电机组
    Visible copper wire core. Pure copper quality, authentic guarantee. Low oil pressure, over current, high oil temperature, over load. Why use a copper rotor instead of an aluminum rotor? Die-casting technology: brushed, brushless generator and brushed motors: Principle: Carbon brush and copper ring friction generate current. Advantages: affordable price, simple and clear design, simple maintenance, low repair cost, excellent low-speed torque performance, large torque, strong instantaneous load capacity, especially easy to start large motors. Mainly suitable for outdoor power: construction sites, factories, mixing stations, mining areas, aquaculture, etc. Mainly because brushed generators are easy to start for large electrical equipment, have strong power, and are fast and easy to repair when they fail. Brushless motor; Principle: Magnetic field generates current, advantages: Eliminates the maintenance-free failure rate of conductive carbon brushes in brushed generators, and the operation and voltage are very stable. Long life, low interference to radio equipment, low noise, especially suitable for high-precision equipment and indoor electrical equipment. Mainly suitable for hospitals, hotels, Internet cafes, KTV, hotel villas, companies and other places. Intelligent automatic control screen, safer high water temperature protection: When the temperature of the water tank of the unit reaches above 98 degrees, the control module will issue a high water temperature warning to stop the protection and overcurrent protection: When the user's load exceeds the power of the generator set, an alarm shutdown will occur . Overload protection: When the user uses a load that exceeds the rated current of the generator set, the generator set will stop and alarm. Low oil pressure protection: When the oil in the generator set is insufficient or reaches the alarm or warning level, the generator set will issue a low oil pressure alarm. Skyworth high-quality radiators have high heat transfer coefficients and good thermal performance. Can increase the heat dissipation area of the outer wall (with winged fins) to increase the flow speed of the air around the radiator (such as a steel string radiator and a cover) to enhance the radiation intensity of the external surface of the radiator (such as a coating with a high radiation coefficient on the external surface) Measures to reduce the thermal resistance between the parts of the radiator (such as the steel string and string of steel string radiators) and other measures to improve the thermal performance of the radiator. Standard configuration: original factory water-cooled diesel engine pure copper generator self-starting controller (standard above 250KW, optional below 250KW) optional radiator configuration: base tank ATS dual power automatic switch control cabinet ATS dual power automatic switch control It should be composed of an intelligent controller and a high-performance dual-power automatic transfer switch, which is suitable for direct automatic switching of main power, main power and emergency power. It forms an automatic induction power supply system with a self-starting diesel generator set, which can power off when the main power After that, the loads such as emergency power supply lighting, security power supply, and fire protection equipment are automatically switched to the generator set. It is an indispensable electrical equipment such as emergency power supply and fire protection power supply for hospitals, banks, airports, radio stations, hotels, intelligent buildings and factory enterprises. The switching operation can be set to automatic mode and manual mode, or it can be switched by manually operating the switch. The panel displays the voltage, current, frequency, power, etc. of the two power sources, and displays the power supply status of the two power sources at the same time. The control module can be set to set one power priority, two power priority or no priority (that is, standby for each other) at the scene. the way. If a control module with a communication interface is selected, the "three remote" functions of remote control, telemetry, and remote signaling of the dual power switch can be realized through the control screen. The control cabinet adopts cold-rolled steel plate material, the surface is electrostatic sprayed, and the components and components are imported or domestic well-known brand products with compact structure. Mobile trailer: The unit has unique innovation, high mobility, low center of gravity, short braking distance, excellent manufacturing, and beautiful appearance. The structural node of the steel plate impeachment suspension is reasonable, the strength is high, and the rigidity is good. The power station is easy to move, flexible to operate, and has good sealing. And equipped with hand brake, air brake, rear tail lights and other systems, in line with highway driving requirements. It is widely used in construction sites, highways, railway construction, and temporary sites. Rain cover: beautiful appearance, reasonable structure; good sealing: rain, snow, dust, and can work in harsh environments; fully enclosed box, made of 2MM steel plate; smooth ventilation inside the box, the temperature is not easy to be too high To ensure the unit's operating power. High-frequency, intermediate-frequency and low-frequency PUR flame-retardant sound-absorbing cotton is used in the cabinet to effectively reduce the different noises emitted by the unit. The door seam is sealed with EPDM type keel seal. The muffler adopts high-resistance muffler, which can effectively reduce the noise of the unit's smoke exhaust port. The operability is good. The designer takes the human-oriented guiding ideology into consideration and fully considers the convenience of the operator in operating the generator set. Parallel cabinet: The parallel control screen can control two or more diesel generators to run in parallel. This system has the following significant advantages: 1. Low purchase cost: Compared with the purchase of a single large-scale unit, the purchase price of several small-scale units is only 50-70% 2. Low use cost: Automatically put in the appropriate number according to the size of the load. Avoid high-power units running at low load. 3. Low maintenance cost: the parts of high-power units are easy to damage and overhaul costs are expensive and it is not easy to organize small-scale units with sufficient parts and low maintenance costs. 4. Long service life: Adopt the rotation rest system to reduce each unit within the same power generation time. Unit usage frequency 5. More reliable: In a grid-connected system, even if one unit fails, other units continue to use, avoiding the situation of single unit failure and all downtime, which is convenient for transportation, lifting and installation . Fuel Tank Battery Floater Battery Charger Mobile Trailer Chassis Product Parameters Speed 1500r / min Fuel consumption 195g / KW * H Dimensions 1650 * 750 * 1450mm Unit weight 650kg Noise (LP7M) 102db (A) Diesel engine parameters 11: 1 cylinder total displacement 11L starting method 24V DC starting cooling method closed cycle water cooling oil supply method direct injection speed regulation method electronic speed regulation intake method turbo generator parameter brand Hong Kong Lilaisenma insulation level H protection Grade IP22 wiring mode Three-phase four-wire / Y-type winding voltage adjustment mode AVR (automatic voltage adjustment) power factor cos = 0.8 (lag)

    康明斯200KW柴油发电机组

    康明斯200KW柴油发电机组

    康明斯200KW柴油发电机组

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 0 RMB Member Price: Hot Sale Price : 0 RMB
    0 RMB Market price: 0 RMB
    2019 - 10 - 24 Release time: 2019-10-24
  • 广西玉柴200KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-200YC6A275-D30LLSM-200GF-200KW Unit Parameter Common Power: 200KW Rated Current: 360A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 225g / KW * H Unit weight: 1520kg Noise (LP7M): 100db (A) Dimensions: 2500 * 900 * 1400 (L * W * H) mmYC6A275-D30 Diesel engine parameters Brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L Displacement: 6.871L Bore stroke: 108 * 125 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed control method: Electronic speed control air intake Method: Turbocharged GF-200 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode : AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴400KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-400YC6K570-D30LLSM-400GF-400KW Unit Parameter Common Power: 400KW rated current: 720A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel Consumption: 215g / KW * H Unit weight: 3500kg Noise (LP7M): 100db (A) Dimensions: 3000 * 900 * 1800 (L * W * H) mmYC6MJ480L-D20 Diesel engine parameters Brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L type Displacement: 12.94L Bore stroke: 129 * 165 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronically controlled intake method : Turbocharged GF-400 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 潍坊30KW柴油发电机组参数(
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-30K4100DLLSM-30GF-30KW Unit Parameters Common Power: 30KW Rated Current: 54A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H unit weight: 650kg noise (LP7M): 100db (A) overall dimensions: 1650 * 600 * 1250 (L * W * H) mmK4100D diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder structure: 4 / L type Displacement: 3.61L Bore stroke: 100 * 115 Starting method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-30 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊50KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-50ZH4105ZDLLSM-50GF-50KW Unit parameters Common power: 50KW rated current: 90A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 203g / KW * H unit weight: 711kg Noise (LP7M): 100db (A) Overall dimensions: 1700 * 750 * 1240 (L * W * H) mmZH4105ZD diesel engine parameter brand: Weifang diesel unit cylinder number / block structure: 4 / L type Displacement: 4.33L Bore stroke: 100 * 115 Starting method: 24V DC starting Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-50 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊30KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-30K4100DLLSM-30GF-30KW Unit Parameters Common Power: 30KW Rated Current: 54A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H unit weight: 650kg noise (LP7M): 100db (A) overall dimensions: 1650 * 600 * 1250 (L * W * H) mmK4100D diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder structure: 4 / L type Displacement: 3.61L Bore stroke: 100 * 115 Starting method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-30 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊40KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-40K4100ZDLLSM-40GF-40KW Unit parameters Common power: 40KW rated current: 72A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 203g / KW * H unit weight: 711kg noise (LP7M): 100db (A) overall dimensions: 1650 * 600 * 1250 (L * W * H) mmK4100ZD diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 4 / L type Displacement: 3.61L Bore stroke: 100 * 115 Starting method: 24V DC starting Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-40 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊120KW柴油发电机组参数(1)
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-120R6105AZLDLLSM-120GF-120KW Unit parameters Common power: 120KW Rated current: 216A Rated voltage: 400V / 230V Rated frequency: 50HZ Rated speed: 1500r / min Fuel consumption: 203g / KW * H unit weight: 1352kg Noise (LP7M): 100db (A) Overall dimensions: 2350 * 800 * 1500 (L * W * H) mmR6105AZLD Diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 6.78L Bore stroke: 105 * 135 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-120 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 重庆康明斯300KW柴油发电机组参数
    Marathon Mechanical and Electrical Chongqing Cummins Unit Model Diesel Engine Model Generator Model GF-300NT855-G2ALLSM-300GF-300KW Unit Parameters Common Power: 300KW Rated Current: 540A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption : 44g / KW * H Unit weight: 2870kg Noise (LP7M): 100db (A) Dimensions: 3200 * 1050 * 2050 (L * W * H) mmNT855-G1A Diesel engine parameter brand: Chongqing Cummins Number of cylinders / block structure: 6 / L Displacement: 14L Bore stroke: 140 * 152mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF- 300 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR ( Automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
10 页次1/2 首页 上一页 1 2 下一页 尾页 Total 10 items Page 1/2 First Previous 1 2 Next Last
contact us
Contact
  • Scan and follow us for more surprises
Copyright © 2005-2013 Yunnan Marathon Mechanical and Electrical Equipment Co., Ltd.
Rhino Cloud provides cloud computing services
Address: No. 75 Dashiba Village, Ala Street, Economic Development Zone, Kunming City, Yunnan Province
Phone: 18187015515
Fax: 0871-67163337
Postcode: 650000