  • 广西玉柴150KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-150YC6B205L-D20LLSM-150GF-150KW Unit Parameter Common Power: 150KW rated current: 270A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel Consumption: 225g / KW * H Unit weight: 1520kg Noise (LP7M): 100db (A) Dimensions: 2500 * 900 * 1400 (L * W * H) mmYC6B205L-D20 Diesel engine parameter brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L Displacement: 6.871L Bore stroke: 108 * 125 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed control method: Electronic speed control air intake Method: Turbocharged GF-150 generator Parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode : AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.     

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴400KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-400YC6K570-D30LLSM-400GF-400KW Unit Parameter Common Power: 400KW rated current: 720A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min Consumption: 215g / KW * H Unit weight: 3500kg Noise (LP7M): 100db (A) Overall dimensions: 3000 * 900 * 1800 (L * W * H) mmYC6MJ480L-D20 Diesel engine parameter brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L type Displacement: 12.94L Bore stroke: 129 * 165 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronically controlled intake method : Turbocharged GF-400 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴600KW柴油发电机组参数
    Marathon Mechanical & Electrical Guangxi Yuchai Unit Model Diesel Engine Model Generator Model GF-600YC6TD840L-D20LLSM-600GF-600KW Unit Parameters Common Power: 600KW Rated Current: 1080A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Consumption: 225g / KW * H Unit weight: 4000kg Noise (LP7M): 100db (A) Overall dimensions: 3700 * 1230 * 2000 (L * W * H) mmYC6TD840L-D20 Diesel engine parameter brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L Displacement: 19.598L Bore stroke: 152 * 180 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronically controlled intake method : Turbocharged GF-600 generator parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    I. After the unit is installed, the following items must be checked before each start:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴900KW柴油发电机组参数
    Guangxi Yuchai 900KW Diesel Generator Set Parameters 50HZ rated speed: 1500r / min fuel consumption: 210g / KW * H unit weight: 9000kg noise (LP7M): 100db (A) overall dimensions: 4500 * 1400 * 2600 (L * W * H) mmYC6C1320-D31 diesel engine parameter brand: Guangxi Yuchai Machinery Co., Ltd. Number of cylinders / body structure: 6 / L Displacement: 39.58L Bore stroke: 200 * 210 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection adjustment Speed mode: Electronically controlled intake method: Turbo-charged GF-900 generator Parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) power factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴250KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-250YC6MK350L-D20LLSM-250GF-250KW Unit Parameters Common Power: 250KW Rated Current: 450A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 215g / KW * H Unit weight: 2056kg Noise (LP7M): 100db (A) Dimensions: 2900 * 1100 * 1660 (L * W * H) mmYC6MK350L-D20 Diesel engine parameter brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L type Displacement: 10.338L Bore stroke: 123 * 145 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation intake Method: Turbocharged GF-250 generator Parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode : AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    I. After the unit is installed, the following items must be checked before each start:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace the components on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴300KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-300YC6MK420L-D20LLSM-300GF-300KW Unit Parameter Common Power: 300KW Rated Current: 540A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 215g / KW * H Unit weight: 2056kg Noise (LP7M): 100db (A) Dimensions: 2830 * 1050 * 1750 (L * W * H) mmYC6MK420L-D20 Diesel engine parameter brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L type Displacement: 10.338L Bore stroke: 123 * 145 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation intake Method: Turbo-charged GF-300 generator Parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode : AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴350KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai Unit Model Unit Diesel Engine Model Generator Model GF-350YC6MJ480L-D20LLSM-350GF-350KW Unit Parameter Common Power: 350KW rated current: 630A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min Consumption: 215g / KW * H Unit weight: 2180kg Noise (LP7M): 100db (A) Dimensions: 2930 * 1050 * 1750 (L * W * H) mmYC6MJ480L-D20 Diesel engine parameter brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L type Displacement: 10.338L Bore stroke: 131 * 145 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed control method: Electronic speed control air intake Method: Turbocharged GF-350 generator parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode : AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people.

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours, so as to burn off the carbon deposits in the engine exhaust system;

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 广西玉柴700KW柴油发电机组参数
    Marathon Mechanical and Electrical Guangxi Yuchai unit model diesel engine model generator model GF-700YC6C1020-D31LLSM-700GF-700KW unit parameters common power: 700KW rated current: 1260A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min Consumption: 210g / KW * H Unit weight: 8000kg Noise (LP7M): 100db (A) Dimensions: 4500 * 1400 * 2600 (L * W * H) mmYC6C1020-D31 Diesel engine parameters Brand: Cylinder of Guangxi Yuchai Machinery Co., Ltd. Number / cylinder structure: 6 / L type Displacement: 39.58L Bore stroke: 200 * 210 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronically controlled intake method : Turbocharged GF-700 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic Voltage Regulation) Power Factor: cosΦ = 0.8 (lag)

    广西玉柴30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. 发电负载设备是否准备好,当发电机直接带负载时,启动前,必须分断空气开关。

    二、运行步骤:

    预热----上电----启动----运行----急停/正常停机

    三、注意事项:

    快猫免费破解版apk发动机温度很低时,应适当延长机组怠速运行时间;当机组暖机后,不允许机组在怠速下长时间运行,不允许机组在空载或小负载情况下连续运行,如此运行将造成发动机涡轮增压器及排气系统积炭严重及漏油现象;

    快猫免费破解版apk不允许机组长时间过载运行,否则将引发机组故障,降低机组使用寿命;

    严禁在机组运行时拆卸、更换机组上零部件;

    添加冷却液时要使用原冷却系统中相同的冷却液,打开加水口盖时,注意是否有高温,防止蒸气或高温冷却液喷出伤人;

    快猫免费破解版apk排放高温润滑油时应防止灼伤;

    必须使用符合国家标准的燃油,否则将会引起发动机喷油泵故障;

    快猫免费破解版apk带涡轮增压器的发动机,不建议机组承受50%以上的突加负载,否则,将引起较大的失速;建议用户对大型用电设备,采取降压、变频等方法控制其启动,以减缓启动时对机组产生较大的电流冲击;

    备用机组或长时间不运行的机组,建议每月至少让机组运行一次至工作温度,每年至少一次要让机组带满负载运行约4小时,这样可以烧掉发动机排气系统内的积炭;

    快猫免费破解版apk手动并机控制机组,必须在确保同步(同频率、同相序、同相位、同电压)后方能合闸;停机前必须先分闸后停机,且在机组使用时必须有人执守,防止单机故障停机。

    四、维护保养:

    为了获得机组最大的运行安全性和使用寿命,对机组定期进行维护保养至关重要,如果能严格遵守机组维护保养的相关条例,就可以保证机组的性能和避免对环境的破坏;

    正确识别并严格遵守柴油发电机组身上的标识(图形、文字、警告等),对维护保养的正确性及操作使用的安全性有着很大的帮助;对机组进行保养时,必须在停机下进行,且须将机组启动电瓶负极电缆拆除,以确保机组不会误启动。

    快猫免费破解版apk首次保养时间,30个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    二次保养时间,60个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    三次保养时间,100个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    以后保养时间,150个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    请严格按照以上时间保养,否则柴油机容易出现故障。


    会员价: 热销价: 9999 RMB
    市场价: 0 RMB
    发布时间: 2018 - 06 - 20
  • 广西玉柴30KW柴油发电机组参数
    马拉松机电广西玉柴机组机组型号柴油机型号发电机型号GF-30YCD4R12D-40LLSM-30GF-30KW机组参数常用功率:30KW额定电流:54A额定电压:400V/230V额定频率:50HZ额定转速:1500r/min燃油消耗:200g/KW*H机组重量:750kg噪声(LP7M):100db(A)外形尺寸:1700*650*1200(L*W*H)mmYCD4R12D-40柴油机参数品牌: 广西玉柴机器股份有限公司气缸数/缸体结构:4/L型排气量:3L缸径行程:96*103启动方式:24V直流电启动冷却方式:闭式水循环冷却供油方式:直喷调速方式:电子调速进气方式:涡轮增压GF-30发电机参数品牌: 香港利莱森玛型号:三相交流同步-TFW2绝缘等级:H级防护等级:IP22接线方式:三相四线/Y型绕接电压调节模式:AVR(自动电压调节)功率因数:cosΦ =0.8(滞后)

    广西玉柴30KW柴油发电机组参数

    Origin:

    一、机组安装完成后,在每次开机前,至少应进行下列项目的检查:

    1. 机组表面及周围是否有杂物阻碍;

    快猫免费破解版apk 2. 机房进、排风通道是否畅通;

    3. 水箱冷却液面是否正常;

    快猫免费破解版apk 4. 空气滤清器是否指示正常;

    快猫免费破解版apk 5. 润滑油油位是否在正常范围内;

    快猫免费破解版apk 6. 燃油阀是否打开,燃油是否已正常地供给发动机;

    7. 电瓶电缆是否已连接正确;

    8. 发电负载设备是否准备好,当发电机直接带负载时,启动前,必须分断空气开关。

    二、运行步骤:

    预热----上电----启动----运行----急停/正常停机

    三、注意事项:

    发动机温度很低时,应适当延长机组怠速运行时间;当机组暖机后,不允许机组在怠速下长时间运行,不允许机组在空载或小负载情况下连续运行,如此运行将造成发动机涡轮增压器及排气系统积炭严重及漏油现象;

    快猫免费破解版apk不允许机组长时间过载运行,否则将引发机组故障,降低机组使用寿命;

    严禁在机组运行时拆卸、更换机组上零部件;

    添加冷却液时要使用原冷却系统中相同的冷却液,打开加水口盖时,注意是否有高温,防止蒸气或高温冷却液喷出伤人;

    排放高温润滑油时应防止灼伤;

    必须使用符合国家标准的燃油,否则将会引起发动机喷油泵故障;

    快猫免费破解版apk带涡轮增压器的发动机,不建议机组承受50%以上的突加负载,否则,将引起较大的失速;建议用户对大型用电设备,采取降压、变频等方法控制其启动,以减缓启动时对机组产生较大的电流冲击;

    快猫免费破解版apk备用机组或长时间不运行的机组,建议每月至少让机组运行一次至工作温度,每年至少一次要让机组带满负载运行约4小时,这样可以烧掉发动机排气系统内的积炭;

    快猫免费破解版apk手动并机控制机组,必须在确保同步(同频率、同相序、同相位、同电压)后方能合闸;停机前必须先分闸后停机,且在机组使用时必须有人执守,防止单机故障停机。

    四、维护保养:

    快猫免费破解版apk为了获得机组最大的运行安全性和使用寿命,对机组定期进行维护保养至关重要,如果能严格遵守机组维护保养的相关条例,就可以保证机组的性能和避免对环境的破坏;

    快猫免费破解版apk正确识别并严格遵守柴油发电机组身上的标识(图形、文字、警告等),对维护保养的正确性及操作使用的安全性有着很大的帮助;对机组进行保养时,必须在停机下进行,且须将机组启动电瓶负极电缆拆除,以确保机组不会误启动。

    快猫免费破解版apk首次保养时间,30个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    二次保养时间,60个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    快猫免费破解版apk三次保养时间,100个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    以后保养时间,150个小时更换机油,柴油滤杯,机油滤杯,空气滤芯。

    请严格按照以上时间保养,否则柴油机容易出现故障。

    会员价: 热销价: 9999 RMB
    市场价: 0 RMB
    发布时间: 2018 - 06 - 20
23 页次1/3 首页 上一页 1 2 3 下一页 尾页
contact us
Contact
  • Scan and follow us for more surprises
Copyright © 2005-2013 Yunnan Marathon Mechanical and Electrical Equipment Co., Ltd.
Rhino Cloud provides cloud computing services
Address: No. 75 Dashiba Village, Ala Street, Economic Development Zone, Kunming City, Yunnan Province
Phone: 18187015515
Fax: 0871-67163337
Postcode: 650000