快猫免费破解版apk

400-1611-663 24-hour service phone: 400-1611-663
/ TODAY'S SPECIALS 更多>> Product Center / TODAY'S SPECIALSMore >>
  • 重庆康明斯1400KW柴油发电机组参数
    Marathon Electromechanical Chongqing Cummins Unit Model Unit Diesel Model Generator Model GF-1400KTA50-GS8LLSM-1400GF-1400KW Unit Parameter Common Power: 1400KW rated current 2520A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 248g / KW * H Unit weight: 9570kg Noise (LP7M): 100db (A) Dimensions: 5120 * 2040 * 2700 (L * W * H) mmKTA50-GS8 Diesel engine parameter brand: Chongqing Cummins Number of cylinders / block structure: 16 / L type Displacement: 50L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF-1400 Generator parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic Voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯1100KW柴油发电机组参数
    Chongqing Cummins 1100KW Diesel Generator Set Parameters Marathon Mechanical and Electrical Chongqing Cummins Unit Model Diesel Model Generator Model GF-1100KTA50-G3LLSM-1100GF-1100KW Unit Parameters Common Power: 1100KW rated current 1980A rated voltage: 400V / 230V rated frequency: 50HZ rated speed : 1500r / min Fuel consumption: 202g / KW * H Unit weight: 9210kg Noise (LP7M): 100db (A) Overall dimensions: 5120 * 2040 * 2640 (L * W * H) mmKTA50-G3 Diesel engine parameter brand: Chongqing Cummins cylinder Number / cylinder structure: 16 / L type Displacement: 50L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation intake method : Turbocharged GF-1100 generator parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation grade: H-grade Protection grade: IP22 Wiring mode: Three-phase four-wire / Y-type winding Voltage regulation mode: AVR (Automatic Voltage Regulation) power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯350KW柴油发电机组参数
    Marathon Mechanical and Electrical Chongqing Cummins unit model diesel engine model generator model GF-350NTA855-G7LLSM-350GF-350KW unit parameters common power: 350KW rated current: 630A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption : 70.9g / KW * H Unit weight: 2900kg Noise (LP7M): 100db (A) Dimensions: 3400 * 1050 * 2050 (L * W * H) mm NTA855-G7 Diesel engine parameter brand: Chongqing Cummins cylinder number / cylinder block structure : 6 / L type Displacement: 14L Bore stroke: 140 * 152mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF -350 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic voltage regulation) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯900KW柴油发电机组参数
    Marathon Electromechanical Chongqing Cummins Unit Unit Model Diesel Engine Model Generator Model GF-900KTA38-G5LLSM-900GF-900KW Unit Parameters Common Power: 900KW rated current 1620A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 211g / KW * H unit weight: 7375kg noise (LP7M): 100db (A) overall dimensions: 4550 * 1850 * 2450 (L * W * H) mmKTA38-G5 diesel engine parameter brand: Chongqing Cummins cylinder number / cylinder block structure: 12 / L type Displacement: 37.8L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF- 900 Generator Parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR ( Automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯250KW柴油发电机组参数
    Marathon Electromechanical Chongqing Cummins Unit Model Diesel Engine Model Generator Model GF-250NT855-G1ALLSM-250GF-250KW Unit Parameters Common Power: 250KW Rated Current: 450A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption : 50.9g / KW * H Unit weight: 2400kg Noise (LP7M): 100db (A) Dimensions: 3200 * 1000 * 1800 (L * W * H) mmNT855-G1A Diesel engine parameter brand: Chongqing Cummins Number of cylinders / block structure : 6 / L type Displacement: 14L Bore stroke: 140 * 152mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF -250 Generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (Automatic voltage regulation) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯500KW柴油发电机组参数
    Chongqing Cummins 500KW diesel generator set parameters Marathon Mechanical and Electrical Chongqing Cummins generator set model Diesel model generator model GF-500KTAA19-G5LLSM-500GF-500KW Unit parameters Common power: 500KW rated current: 900A rated voltage: 400V / 230V rated frequency: 50HZ rated Speed: 1500r / min Fuel consumption: 96g / KW * H Unit weight: 4310kg Noise (LP7M): 100db (A) Dimensions: 3850 * 1530 * 2270 (L * W * H) mmKTAA19-G5 Diesel engine parameter brand: Chongqing Cummins Number of cylinders / body structure: 6 / L Displacement: 18.9L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed control method: Electronic speed control Pneumatic mode: Turbocharged GF-500 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type Winding voltage adjustment mode: AVR (automatic voltage adjustment) power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯550KW柴油发电机组参数
    Chongqing Cummins 550KW Diesel Generator Set Parameters Marathon Mechanical and Electrical Chongqing Cummins Unit Model Diesel Model Generator Model GF-550KTA19-G8LLSM-550GF-550KW Unit Parameters Common Power: 550KW rated current: 990A rated voltage: 400V / 230V rated frequency: 50HZ rated Speed: 1500r / min Fuel consumption: 120g / KW * H Unit weight: 4400kg Noise (LP7M): 100db (A) Dimensions: 4000 * 1530 * 2270 (L * W * H) mmKTA19-G8 Diesel engine parameter brand: Chongqing Cummins Number of cylinders / body structure: 6 / L Displacement: 18.9L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed control method: Electronic speed control Pneumatic method: Turbo-charged GF-550 generator Parameter Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation class: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type Winding voltage adjustment mode: AVR (automatic voltage adjustment) power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    I. After the unit is installed, the following items must be checked before each start:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯600KW柴油发电机组参数
    Marathon Mechanical and Electrical Chongqing Cummins Unit Model Diesel Model Generator Model GF-600KTAA19-G6ALLSM-600GF-600KW Unit Parameters Common Power: 600KW rated current 1080A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 202g / KW * H Unit weight: 4400kg Noise (LP7M): 100db (A) Dimensions: 4000 * 1530 * 2270 (L * W * H) mmKTAA19-G6A Diesel engine parameter brand: Chongqing Cummins Number of cylinders / block structure: 6 / L type Displacement: 19L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation Air intake method: Turbocharged GF-600 Generator parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic Voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    I. After the unit is installed, the following items must be checked before each start:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
  • 重庆康明斯700KW柴油发电机组参数
    Chongqing Cummins 700KW Diesel Generator Set Parameters Marathon Mechanical and Electrical Chongqing Cummins Unit Model Diesel Model Generator Model GF-700KTA38-GALLSM-700GF-700KW Unit Parameters Common Power: 700KW rated current 1260A rated voltage: 400V / 230V rated frequency: 50HZ rated speed : 1500r / min Fuel consumption: 157g / KW * H Unit weight: 6580kg Noise (LP7M): 100db (A) Dimensions: 4300 * 1650 * 2270 (L * W * H) mmKTA38-GA Diesel engine parameter brand: Chongqing Cummins cylinder Number / cylinder structure: 12 / L Displacement: 18.9L Bore stroke: 159 * 159mm Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Electronic speed regulation intake Method: Turbo-charged GF-700 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous brushless generator-TFW2 Insulation level: H-class Protection level: IP22 Wiring method: Three-phase four-wire / Y-type winding Connection voltage regulation mode: AVR (Automatic Voltage Regulation) power factor: cosΦ = 0.8 (lag)

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组

    重庆康明斯200KW柴油发电机组



    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 99999 RMB Member Price: Hot Sale Price : 99999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 20 Release time: 2018-06-20
17 页次1/2 首页 上一页 1 2 下一页 尾页 Total 17 items Page 1/2 First Previous 1 2 Next Last
contact us
Contact
  • Scan and follow us for more surprises
Copyright © 2005-2013 Yunnan Marathon Mechanical and Electrical Equipment Co., Ltd.
Rhino Cloud provides cloud computing services
Address: No. 75 Dashiba Village, Ala Street, Economic Development Zone, Kunming City, Yunnan Province
Phone: 18187015515
Fax: 0871-67163337
Postcode: 650000