    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-300618DLLSM-300GF-300KW Unit Parameters Common Power: 300KW Rated Current: 540A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H unit weight: 1780kg noise (LP7M): 100db (A) overall dimensions: 2800 * 1100 * 1800 (L * W * H) mmWP10 diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 9.726L Bore stroke: 126 * 130 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-300 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊350KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-350618DLLSM-350GF-350KW Unit Parameters Common Power: 350KW Rated Current: 630A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H unit weight: 1780kg noise (LP7M): 100db (A) overall dimensions: 2800 * 1100 * 1800 (L * W * H) mmWP10 diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 9.726L Bore stroke: 126 * 130 Starting method: 24V DC starting Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-350 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊400KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-400WP12LLSM-400GF-400KW Unit Parameters Common Power: 400KW Rated Current: 720A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / min Fuel Consumption: 203g / KW * H unit weight: 1780kg noise (LP7M): 100db (A) overall dimensions: 2800 * 1100 * 1800 (L * W * H) mmWP12 diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 9.726L Bore stroke: 126 * 130 Starting method: 24V DC starting Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-400 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊250KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-250WP10LLSM-250GF-250KW Unit parameters Common power: 250KW Rated current: 450A Rated voltage: 400V / 230V Rated frequency: 50HZ Rated speed: 1500r / min Fuel consumption: 203g / KW * H unit weight: 1650kg Noise (LP7M): 100db (A) Overall dimensions: 2700 * 1000 * 1700 (L * W * H) mmWP10 diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 9.726L Bore stroke: 126 * 130 Starting method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-250 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊200KW柴油发电机组参数
    Weifang 200KW Diesel Generator Set Parameters Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-2006126ZLDLLSM-200GF-200KW Unit Parameters Common Power: 200KW Rated Current: 360A Rated Voltage: 400V / 230V Rated Frequency: 50HZ Rated Speed: 1500r / Min fuel consumption: 203g / KW * H Unit weight: 1650kg Noise (LP7M): 100db (A) Dimensions: 2700 * 1000 * 1700 (L * W * H) mm6126ZLD diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block Structure: 6 / L Displacement: 9.726L Bore stroke: 126 * 130 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbo-increasing GF-200 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic Voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊150KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-150R6105IZLDLLSM-150GF-150KW Unit parameters Common power: 150KW Rated current: 270A Rated voltage: 400V / 230V Rated frequency: 50HZ Rated speed: 1500r / min Fuel consumption: 203g / KW * H unit weight: 1360kg noise (LP7M): 100db (A) overall dimensions: 2400 * 900 * 1600 (L * W * H) mmR6105IZLD diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 7.01L Bore stroke: 105 * 135 Starting method: 24V DC starting Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-150 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊120KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-120R6105AZLDLLSM-120GF-120KW Unit parameters Common power: 120KW Rated current: 216A Rated voltage: 400V / 230V Rated frequency: 50HZ Rated speed: 1500r / min Fuel consumption: 203g / KW * H unit weight: 1352kg Noise (LP7M): 100db (A) Overall dimensions: 2350 * 800 * 1500 (L * W * H) mmR6105AZLD Diesel engine parameter brand: Weifang diesel unit cylinder number / cylinder block structure: 6 / L type Displacement: 6.78L Bore stroke: 105 * 135 Start method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-120 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊75KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-75R4108LLSM-75GF-75KW Unit Parameters Common Power: 75KW rated current: 135A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 203g / KW * H unit weight: 1125kg noise (LP7M): 100db (A) overall dimensions: 2200 * 800 * 1500 (L * W * H) mmR4108 diesel engine parameter brand: Weifang diesel unit cylinder number / block structure: 4 / L type Displacement: 6048L Bore stroke: 105 * 130 Starting method: 24V DC start Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-75 generator parameters Brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to be overloaded for a long time, otherwise it will cause the unit to fail and reduce the unit's service life;

    It is strictly forbidden to disassemble and replace parts on the unit when the unit allows;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.

    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
  • 潍坊50KW柴油发电机组参数
    Marathon Mechanical and Electrical Weifang Unit Model Diesel Engine Model Generator Model GF-50ZH4105ZDLLSM-50GF-50KW Unit parameters Common power: 50KW rated current: 90A rated voltage: 400V / 230V rated frequency: 50HZ rated speed: 1500r / min fuel consumption: 203g / KW * H unit weight: 711kg Noise (LP7M): 100db (A) Overall dimensions: 1700 * 750 * 1240 (L * W * H) mmZH4105ZD diesel engine parameter brand: Weifang diesel unit cylinder number / block structure: 4 / L type Displacement: 4.33L Bore stroke: 100 * 115 Starting method: 24V DC starting Cooling method: Closed water circulation cooling Oil supply method: Direct injection speed regulation method: Mechanical speed regulation Air intake method: Turbocharged GF-50 generator Parameter brand: Hong Kong Lilaisenma Model: Three-phase AC synchronous-TFW2 Insulation class: H-class Protection class: IP22 Wiring method: Three-phase four-wire / Y-type winding voltage adjustment mode: AVR (automatic voltage adjustment) Power factor: cosΦ = 0.8 (lag)

    潍坊30KW柴油发电机组参数

    Origin:

    1. After the unit installation is completed, at least the following items should be checked before each start-up:

    1. Whether there is any obstruction on the surface and around the unit;

    2. Whether the air intake and exhaust channels of the equipment room are unblocked;

    3. Whether the water tank cooling liquid level is normal;

    4. Whether the air filter indicates normal;

    5. Whether the lubricating oil level is within the normal range;

    6. Whether the fuel valve is open and whether the fuel has been supplied to the engine normally;

    7. Whether the battery cable is connected correctly;

    8. Whether the power generation load equipment is ready. When the generator is directly loaded, the air switch must be disconnected before starting.

    Second, the operation steps:

    Warm-up-power-up-start-run-emergency stop / normal stop

    Three, matters needing attention:

    When the engine temperature is very low, the idle time of the unit should be appropriately extended; when the unit is warmed up, the unit is not allowed to run for a long time at idle and the unit is not allowed to run continuously under no-load or light load conditions. Such operation will cause the engine turbine Severe carbon deposits and oil leakage in the supercharger and exhaust system;

    Do not allow the unit to overload for a long time, otherwise it will cause the unit to fail and reduce the service life of the unit;

    It is strictly forbidden to disassemble and replace parts on the unit while the unit is running;

    When adding coolant, use the same coolant in the original cooling system. When opening the water filler cap, pay attention to whether there is high temperature to prevent steam or high temperature coolant from spraying and hurting people;

    Prevent burns when discharging high temperature lubricants;

    You must use fuel that complies with national standards, otherwise it will cause engine fuel injection pump failure;

    For engines with turbochargers, it is not recommended that the unit be subjected to a sudden load of more than 50%, otherwise it will cause a large stall; users are advised to control the start-up of large electrical equipment by stepping down and frequency conversion to slow down Large current impact on the unit when starting;

    For standby units or units that have not been running for a long time, it is recommended to run the units at least once a month to the operating temperature, and at least once a year to allow the units to run at full load for about 4 hours.

    Manual parallel control of the unit must be closed after ensuring synchronization (same frequency, same phase sequence, same phase, same voltage); it must be opened before shutdown and then stopped, and someone must be guarded when the unit is in use to prevent single machine failure Stop.

    Fourth, maintenance:

    In order to obtain the maximum operating safety and service life of the unit, it is important for the unit to perform regular maintenance. If the relevant regulations of the unit maintenance can be strictly adhered to, the performance of the unit and the environmental damage can be avoided;

    Correctly identifying and strictly observing the signs (graphics, words, warnings, etc.) on the diesel generator set will greatly help the correctness of maintenance and the safety of operation and use; when maintaining the unit, it must be performed under shutdown. And the negative cable of the start battery of the unit must be removed to ensure that the unit will not start by mistake.

    First maintenance time, 30 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Second maintenance time, 60 hours to change oil, diesel filter cup, oil filter cup, air filter element.

    Three maintenance times, 100 hours of oil change, diesel filter cup, oil filter cup, air filter element.

    After maintenance time, change the oil, diesel filter cup, oil filter cup, air filter element for 150 hours.

    Please maintain strictly according to the above time, otherwise the diesel engine is prone to failure.


    热销价: 9999 RMB Member Price: Hot Sale Price : 9999 RMB
    0 RMB Market price: 0 RMB
    2018 - 06 - 11 Release time: 2018-06-11
12 页次1/2 首页 上一页 1 2 下一页 尾页 Total 12 items Page 1/2 First Previous 1 2 Next Last
contact us
Contact
  • Scan and follow us for more surprises
Copyright © 2005-2013 Yunnan Marathon Mechanical and Electrical Equipment Co., Ltd.
Rhino Cloud provides cloud computing services
Address: No. 75 Dashiba Village, Ala Street, Economic Development Zone, Kunming City, Yunnan Province
Phone: 18187015515
Fax: 0871-67163337
Postcode: 650000